Skip to content
Booking spring walk-throughs for condo and HOA buildings now.
Monday – Friday: 7:00 a.m. – 4:30 p.m. · Saturday – Sunday: Closed · Active leaks and unsafe stairs: leave a message on the office line. It is checked on weekends.Monday – Friday: 7:00 a.m. – 4:30 p.m.Calls and emails answered within one business dayConstruction Supervisor · MA CSL # 000000Home Improvement Contractor · MA HIC reg. # 000000General liability and workers' compensation
2 more licenses
  • Construction Supervisor · MA CSL # 000000
  • Home Improvement Contractor · MA HIC reg. # 000000
  • General liability and workers' compensation

A scope sheet is one page for one repair

Boards don't need a contractor who arrives with a number. They need a page they can put in the packet, vote on and hand to an owner who asks what the money is for. Every repair we propose, from a loose rail to a roof section, gets one.

Blank clipboard with a pencil on a cork board

Eight lines on every sheet

  • 01

    The item and where

    A photo with the location marked on a plan or elevation.

  • 02

    Why now

    What happens if the board waits a year, said plainly.

  • 03

    What we will do

    The repair, the materials and the method.

  • 04

    What we won't

    What is left out, so nobody assumes it is in.

  • 05

    Access and noise

    How we reach the work, the hours, and what owners will hear.

  • 06

    Owner notice

    A draft letter with dates, for your manager to send.

  • 07

    Price and what moves it

    A fixed figure, and the conditions that could change it.

  • 08

    Warranty terms

    The term, what it covers and what it excludes, in writing.

A sample sheet

The price line, line by line

This is an example for a three-unit building. Your sheet carries your own lines.

  • Rear porch guards, third floor

    Replace six guard posts and the rails between them on the third-floor rear porch, painted to match.

    • Remove six guard posts and the rails
    • Set new pressure-treated posts through the deck framing
    • New rails and balusters, primed and painted to match
    • Flash and seal the post bases
    • Staging, protection and clean-up
    • Replacing the deck boards
    • Permit fee, if required

Fixed price, valid for 30 days. A permit, if the building department requires one, is billed at cost. Warranty term, coverage and exclusions are written on the sheet.

Questions about scope sheets

Who writes them?

Usha Narine, our estimator, writes each sheet after the walk-through and Novlette Mullings reads it before it goes out.

Can the board change a sheet?

Yes. Cross out a line, ask for an option, or split one sheet in two. We reissue it and the price follows.

What if the work turns out bigger?

We stop and write a change sheet with the new figure. Nothing is added to the work until the board signs it.

Do you hold sheets for later years?

Yes. Items the board defers stay on the calendar, with photos from the day we found them.

Ask for a blank scope sheet

We will send one so the board can read the form before the first visit.